Lake Sapanca is simultaneously a major drinking-water source, a growing tourism destination and a shoreline residents want to enjoy. New projects need to protect water, control development and reduce losses and pollution as well as provide visitor facilities.

💧 What did the water figures show?​

On 7 August 2026, the lake’s recorded level was 29.90 m, compared with 29.79 m on the same date in 2025 — an increase of 11 cm. See the Sakarya Municipality report. These are measured water-level elevations, not the lake’s depth.

The improvement did not remove drought risk. During a period of pressure in 2025, the level reached 29.42 m, near a historic low of 29.27 m. Summer demand is high, coinciding with tourism, garden watering and swimming-pool filling.

🚰 Measures supporting the improvement​

The water authority linked the improvement to:
  • Transfers from alternative water sources.
  • An additional pump at Mollaköy.
  • Regular testing of transferred water against 44 parameters.
  • Closer network monitoring and reduced leakage.
  • Progress on alternative dams and supply lines.
Ballıkaya Dam, with announced storage capacity of 143 million m³, forms part of future water security. Full benefits depend on completion of transmission lines; it should not be described as already supplying the city at its full capacity.

🛠️ Protecting water before it reaches the lake​

An infrastructure project covers neighbourhoods in Sapanca, Akyazı and Hendek. The new-network protection programme describes a total of 108 km, including renewed water lines and sections of the lake’s wastewater collector.

Two further announced investments in Sapanca involve approximately 65 km of drinking-water and wastewater lines, intended to reduce losses and prevent contaminated flows reaching the basin. These less visible works are essential to the lake’s future.

🌿 What changed on the shore?​

The municipality’s 5 October 2026 update distinguishes Sapanca Park from Huzur Koridoru. Sapanca Park’s first 6 km section was nearing completion, while work had begun on its 10 km second phase. In Serdivan, the first 2 km of Huzur Koridoru had opened; the tender for its second 2 km phase was held on 5 October.

The connected 20 km shoreline corridor is a future outcome of completing the phases and joining both projects, not a fully open route. Public access to parts of Sapanca Park does not establish completion of its entire first 6 km section.

🏡 Where does tourism create pressure?​

Growth in holiday cabins and villas creates opportunities, but increases pressure on:
  • Drinking water and pool supplies in summer.
  • Rural wastewater systems.
  • Narrow roads and parking.
  • Waste collection and forest protection.
  • Residential peace and quiet.
  • Land within the water-protection basin.
A lake view does not justify building in a sensitive location. Before buying a tourism property, check permissions, land classification, sewer connections, setbacks and catchment restrictions.

✅ Conclusion​

Sapanca is a water reserve requiring careful management as well as a visitor destination. The August improvement over 2025 was positive, but climate and summer demand remain pressures. The priorities are public shore access, well-managed tourism, reliable wastewater systems and diversified water sources.